Home / Blog / Wooden Flooring
Wooden Flooring
How Wooden Flooring Is Installed: A Step by Step Guide

Wooden flooring is installed as a floating floor: a 2 mm foam underlay goes down first, and the planks click together on top of it without glue or nails. Our team lays 400 to 500 sq.ft in a day, so most rooms are finished and ready to use in a single day.
Here is what happens from the first visit to the finished floor.
1. Site visit and measurement
Our team visits your home to measure every room, check the existing floor and plan the layout. We look at how level and dry the floor is, where the doors open, and which way the planks should run. Planks usually look best running towards the main light source or along the longest wall.
2. Choosing the design
You choose your design at our showroom or from the wooden flooring collection. We work out the quantity with a small allowance for cutting.
3. Preparing the room
Before installation day, clear the room of furniture if you can. The existing floor should be clean, dry and level. In most homes we lay directly over existing tiles. If you want your old flooring removed first, our team can do that on request.
4. Laying the underlay
A 2 mm foam underlay is rolled out over the whole floor. It evens out small bumps, softens footsteps and reduces noise for the floor below.
5. Laying the planks
The planks interlock on all four sides. The team starts along one wall and works across the room, staggering the joints like brickwork for strength and a natural look. A small expansion gap is left around the edges of the room so the floor can move slightly with the seasons.
6. Doors and edges
Door frames are undercut so the planks slide neatly beneath them. Skirting covers the expansion gap along the walls, and threshold profiles finish the edges at doorways where the wooden floor meets tiles.
7. Ready to use
There is no glue to dry and no polish to apply, so you can walk on the floor and move furniture back the same day.
How long does it take?
| Area | Typical time |
|---|---|
| One bedroom | Half a day |
| Two or three rooms | One day |
| A full apartment | One to two days |
Where we install
Our own trained team installs across Coimbatore, including RS Puram, Saibaba Colony, Thudiyalur, Saravanampatti, Vadavalli and Peelamedu, and we can plan installations in nearby cities too. Share your room sizes on WhatsApp, or see designs and prices on our wooden flooring page.
Frequently asked questions
Do you use glue or nails?
No. The planks click together on a 2 mm foam underlay. There is no adhesive and no nailing.
Can I stay at home during installation?
Yes. It is a clean, dry process with no cement or glue fumes. Just keep the room being worked on clear.
Who installs the flooring?
Our own trained installation team measures and lays every floor we supply in Coimbatore.
Have a question about wooden flooring? Message us on WhatsApp or visit JTC Studio in Coimbatore, near Chintamani Signal, Monday to Saturday from 10 AM to 7:30 PM.
Jay Trading Company

